Grand Harbour seen from Valletta

Malta, 35°54′N 14°31′E

Bunker Supplier in Malta

Bunkering in Malta is done by barge, in port or at offshore areas designated by the Authority. The ship gives 72 hours' notice, and a barge may not go alongside after sunset without permission.

Photo: Marie-Lan Nguyen, CC BY 2.5, Wikimedia Commons

Sulphur
0.10%, under way and at berth
Delivery
Barge: in port and designated areas
Authority
Transport Malta
Notice
72 hours before arrival, 24 at the latest

Bunkering in Malta

Malta lies on the route between the Suez Canal and the Strait of Gibraltar. A ship can take fuel at designated areas outside port with little deviation; Hurd's Bank, east of the islands, is known as an anchoring place for this. In port, bunkering is only allowed at Marsaxlokk, Marsamxett, Grand Harbour and Mġarr, at places the Authority authorises.

Few Mediterranean texts set out bunkering in this much detail. S.L. 499.12 covers when a barge goes alongside, who chooses the area, night work and booms, article by article. It also requires offshore bunkering to take place on the lee coast.

Ships and fortifications in the Grand Harbour
Ships and fortifications in the Grand Harbour Photo: Vicki Burton, CC BY-SA 2.0, Wikimedia Commons

Bunkering Process in Malta

  1. Area and Grades

    State in port or offshore, ETA and quantity. Simultaneous multi-grade delivery needs prior written authorisation.

  2. Arrival Notice

    A ship coming to territorial waters or port for bunkers gives 72 hours' notice. The Authority may accept notice as early as possible, but not less than 24 hours.

  3. Area Approval

    The barge master tells the Authority which area was agreed with the ship and cannot start before approval. The barge is in position first. The receiving master is responsible for the choice of area and safe navigation.

  4. Sunset

    A barge may not go alongside after sunset without authorisation. If work will run on, the master informs the Authority and asks for permission; otherwise the barge leaves before sunset.

  5. Checklist and Documents

    Both masters complete safety checklists before the operation and at each stage. Under MARPOL the BDN is kept for three years and the sample for at least 12 months.

Bunkering Requirements in Malta

Rules change. Confirm current practice with the port agent.

  • Legal Basis

    S.L. 499.12 Dangerous Cargo Ships, Marine Terminals and Facilities and Bunkering Regulations.

  • Licensed Barges

    Every barge operation in Maltese waters and ports uses a licensed or authorised barge. A barge may not anchor without authorisation.

  • Pollution Precautions in Port

    Booms are deployed for in-port operations, and barges carry spill response equipment.

  • EU Rules

    Directive 2016/802 applies 0.10% at berth and requires the changeover time in the logbook, with exemptions for ships at berth under two hours and ships on shore power. FuelEU Maritime covers ships above 5,000 GT calling at EU ports under any flag: well-to-wake GHG intensity must be 2% below the 2020 baseline in 2025 and 6% below in 2030.

World ECA map: 0.10% sulphur areas

Products and Quotes for Malta

We quote for fuel oil (including VLSFO), gas oil (MGO) and marine lubricants. For details see Fuel Oil and Gas Oil and Marine Oils.

Malta Bunker Supply: Common Questions

Is night bunkering possible in Malta?

A barge may not go alongside after sunset without the Authority's prior express permission. Work running past sunset needs an extension.

How much notice does Malta require?

72 hours before arrival in territorial waters. The Authority may accept shorter notice, but not less than 24 hours.

Is Hurd's Bank an official bunkering area?

The regulation names no areas and says the Authority designates them. Ask your agent for the current list.