Malta, 35°54′N 14°31′E
Bunker Supplier in Malta
Bunkering in Malta is done by barge, in port or at offshore areas designated by the Authority. The ship gives 72 hours' notice, and a barge may not go alongside after sunset without permission.
Photo: Marie-Lan Nguyen, CC BY 2.5, Wikimedia Commons
- Sulphur
- 0.10%, under way and at berth
- Delivery
- Barge: in port and designated areas
- Authority
- Transport Malta
- Notice
- 72 hours before arrival, 24 at the latest
Bunkering in Malta
Malta lies on the route between the Suez Canal and the Strait of Gibraltar. A ship can take fuel at designated areas outside port with little deviation; Hurd's Bank, east of the islands, is known as an anchoring place for this. In port, bunkering is only allowed at Marsaxlokk, Marsamxett, Grand Harbour and Mġarr, at places the Authority authorises.
Few Mediterranean texts set out bunkering in this much detail. S.L. 499.12 covers when a barge goes alongside, who chooses the area, night work and booms, article by article. It also requires offshore bunkering to take place on the lee coast.

Bunkering Process in Malta
Area and Grades
State in port or offshore, ETA and quantity. Simultaneous multi-grade delivery needs prior written authorisation.
Arrival Notice
A ship coming to territorial waters or port for bunkers gives 72 hours' notice. The Authority may accept notice as early as possible, but not less than 24 hours.
Area Approval
The barge master tells the Authority which area was agreed with the ship and cannot start before approval. The barge is in position first. The receiving master is responsible for the choice of area and safe navigation.
Sunset
A barge may not go alongside after sunset without authorisation. If work will run on, the master informs the Authority and asks for permission; otherwise the barge leaves before sunset.
Checklist and Documents
Both masters complete safety checklists before the operation and at each stage. Under MARPOL the BDN is kept for three years and the sample for at least 12 months.
Bunkering Requirements in Malta
Rules change. Confirm current practice with the port agent.
Legal Basis
S.L. 499.12 Dangerous Cargo Ships, Marine Terminals and Facilities and Bunkering Regulations.
Licensed Barges
Every barge operation in Maltese waters and ports uses a licensed or authorised barge. A barge may not anchor without authorisation.
Pollution Precautions in Port
Booms are deployed for in-port operations, and barges carry spill response equipment.
EU Rules
Directive 2016/802 applies 0.10% at berth and requires the changeover time in the logbook, with exemptions for ships at berth under two hours and ships on shore power. FuelEU Maritime covers ships above 5,000 GT calling at EU ports under any flag: well-to-wake GHG intensity must be 2% below the 2020 baseline in 2025 and 6% below in 2030.
Products and Quotes for Malta
We quote for fuel oil (including VLSFO), gas oil (MGO) and marine lubricants. For details see Fuel Oil and Gas Oil and Marine Oils.
Malta Bunker Supply: Common Questions
Is night bunkering possible in Malta?
A barge may not go alongside after sunset without the Authority's prior express permission. Work running past sunset needs an extension.
How much notice does Malta require?
72 hours before arrival in territorial waters. The Authority may accept shorter notice, but not less than 24 hours.
Is Hurd's Bank an official bunkering area?
The regulation names no areas and says the Authority designates them. Ask your agent for the current list.
Sources (5)
This page is general information, not legal advice. Last checked: 4 November 2026.